Product center

A common choice of global customers

  • PLASTERING PAINTING AND POLISHING

     · Plastering Painting and Polishing 99 taking the paint through brush so that the texture of the paint remains the same. While painting brush is moved from top to bottom and then from right to left and in the end the brush is slowly moved after bringing it

    Chat Online
  • Unit rates for construction cost estimating the all

     · Hi Doina interesting article as always. I have a question how to include in unit rates the fixed costs of the assets. If I have an equipment (not directly related to the activities) that costs to me X in one year but I do not know the actual volume of the job (or it is highly uncertain) how can I split the equiment cost in the unit rates

    Chat Online
  • ESTIMATION AND VALUATIONalphace.ac

     · ii) Cost of labour The exact number of labourers required for unit of work and the multiplied by the wages/ day to get of labour for unit item work. iii) Cost of equipment (T P) Some works need special type of equipment tools and plant. In such case an amount of 1 to 2 of estimated cost is provided.

    Chat Online
  • COST AND PRODUCTIVITY ANALYSIS OF EQUIPMENTS

     · rate and unit cost for production of construction equipment. Analysis is performed on six different earth moving equipments for time span of 15 years. It is shown that production rate has increased 1.58 on average per year. The unit price of production has increases 1.77 on

    Chat Online
  • How To Calculate Materials In Concrete Foundation

     · To do this calculation add the sum of ratio 1 2 4=7. Calculate the cubic volume of concrete for foundation. Going by the previous article the total lenght of trench was taken as 65.6m. Height of concrete beam is 1.1m or 1100m from image 2. And width is 0.225m or 225mm. therefore total volume of concrete beams =65.6m x 1.1 x 0.225 =16.236.

    Chat Online
  • How to calculate the numbers of bags of cement in the

     · Taking the thickness of block as 150mm or 6" the foundation base is taken as 150mm(or 0.15m x 3)=450mm or 0.45m or 18". Now for any concrete you want to calculate first find out the volume. For the foundation of the plan above. 450mm(breadth) x 72.5m (entire length) x 150mm(foundation base thickness)=4.894m3

    Chat Online
  • Calculation of Construction Time for Building Projects

     · determine output such as the maximum number of available workers or the maximum number of available machines or pieces of equipment. This paper is to systematically present construction time calculation methods. In addition the calculation procedure should account for limiting construction management factors. Both

    Chat Online
  • Equipment Sizing and Capital Cost Estimation

     · Equipment Sizing and Capital Cost Estimation 15 Cost Equations SSL (2004) –Purchase Cost Equationsfor numerous process units –see Table 16.32 for "other" equipment items. •Available literature sources back to 1960 consulted. •After determining a suitable equipment size factor all of the cost data were plotted.

    Chat Online
  • How to Calculate Cement Sand Quantity for Plastering

     · Mortar Calculation for Plastering work Point Should Be Know Before Estimating Density of Cement = 1440 kg/m3. Sand Density = kg/m3. Density of Aggregate = kg/m 3. How many KG in 1 bag of cement = 50kg

    Chat Online
  • The cost of a project activity Calculating the activity

     · Fixed use the unit for the cost/unit calculation of a consumable resource is anything but a time dimension. It is an indication that the quantity of the resource used by an activity is independent from its duration. A typical example is the cost per unit for materials such as bricks needed to build a wall which is equal to € 100 per pallet

    Chat Online
  • How to measure the amount of leaning bowing or

    How to measure the severity of foundation wall bulging or leaning This article series explains a simple procedure using string and a measuring tape to measure the amount of leaning bowing or bulging in a cracked bulged or tipped building foundation wall or in any other building wall or vertical surface.

    Chat Online
  • Principles of Production Economics and Cost Concepts

     · marginal product (MP) multiplied by the price of the product (PY that is VMP = MP Pyor j- PY The input price is the price per unit input and is given as PX. The most profitable level of production is where VMP = PX and according to table 2.3 this is between 8 and 9 units input because the VMP of R12 then equals the PX of R12.

    Chat Online
  • plastering estimate philippines

    House Construction Cost in the Philippines Topnotch. Estimating through area method is the faster way to derived the cost of construction. The Contractors only need to get the required floor area and he can then derive the total cost of the building by multiplying it by a cost factor which may range from as low as P15000/sq m and as high as P25000/sq m for a decent livable building.

    Chat Online
  • How to Calculate Construction Equipment Lifecycle Costs

     · Fleets seeking to establish the lifecycle cost for construction/off-road equipment should follow five basic steps Determine the equipment s net acquisition cost factoring in incentives and any other options or variables. Establish the equipment s estimated depreciation rate (more on this later). Identify other fixed costs such as interest

    Chat Online
  • Unit rates for construction cost estimating the all

     · Hi Doina interesting article as always. I have a question how to include in unit rates the fixed costs of the assets. If I have an equipment (not directly related to the activities) that costs to me X in one year but I do not know the actual volume of the job (or it is highly uncertain) how can I split the equiment cost in the unit rates

    Chat Online
  • CHAPTER 5 ESTIMATING WORK ITEMS COSTS IDIRECT

     · Backhoe unit price = 670 / 8 = LE83.75/hr This crew produces 60 m3/day Labor price/m3 = 55 / 60 = LE0.92/m3 Equipment price/m3 = 83.75 / 60 = LE1.4/m3 Transportation price = 4000 / 3000 = LE1.33/m3 Then price/m3 = LE3.65/m3 Example 5.2 Calculate the price of obtaining a gravel form a pit located 16 km from the work site where unit price is

    Chat Online
  • CHAPTER 2 QUANTITY TAKE-OFFDelta Univ

     · - Prices differ based on the soil type deep of excavation ground water level site location shoring system Equipment used etc.Unit of measurement is cubic meter (vol ume) nsider the following example (Figure 2.3). Fig. 2.3 Plan and cross section of building foundation The length of excavation = 5.4 2 (4.42) 2 = 15.6 m

    Chat Online
  • CHAPTER 4 COST OF CONSTRUCTION LABOR AND

     · A contractor determines that the unit productivity for painting a wall is 0.55 hour per m2. If the local wage rate including burden and fringe benefits is LE30 per hour the unit labor cost becomes LE16.50 per m2. If the wage rate is LE20 per hour the unit labor cost becomes LE11 per m2. In addition productivity performance between

    Chat Online
  • Unit 9 Measuring Estimating and Tendering Processes in

     · plastering dry linings painting and decorating plumbing work electrical installation glazing 4 Be able to derive approximate quantities and costs to determine the approximate value of building projects Traditional cost modeling approximate estimating techniques cost per unit

    Chat Online
  • How to Calculate Total Variable Cost Indeed

     · To determine the total variable cost the company will spend to produce 100 units of product the following formula is used Total output quantity x variable cost of each output unit = total variable cost. For this example this formula is as follows 100 x 37 = 3 700. This means that the total variable cost required to produce 100 units is 3 700.

    Chat Online
  • Rate Analysis of Excavation in Earthwork -Calculate Cost

    The cost of hydraulic excavator for 10m 3 excavation = 0.04125x5000 = Rs.206.25 Likewise based on the capacity of other equipment labors etc. their cost is calculated. Contractors profit is also added to the total cost of labors and machineries. Then grand total gives the rate of excavation per 10m 3

    Chat Online
  • plastering cost per square meter in philippines

    construction cost per square meter Philippines. Below is the average cost to overboard and plaster a ceiling per square metre. Provinces with 10 or less than 10 new projects are Davao Occidental Western Samar Camarines Norte Cotabato City Lanao Del Norte Ifugao Batanes Zamboanga Sibugay Nueva Vizcaya Agusan Del Sur Maguindanao Abra Isabela City and Lanao Del Sur with Isabela City

    Chat Online
  • How to calculate the life cycle cost of equipment. MC

     · · Cost of parts · Labour · Consumables and · Downtime. 2. Reactive Maintenance Life Cycle Costs. When you react to a breakdown in addition to the cost of lost productivity (particularly if it is a critical piece of equipment) you also have to account for hard costs of parts labour and consumables.

    Chat Online
  • Cost Analysis Key Components Guidance and Checklist

     · Cost Realism Analysis Cost realism analyses shall be performed on cost-reimbursement contracts to determine the probable cost of performance for each offeror. Cost realism is the process of independently reviewing and evaluating specific elements of each Applicant/Offeror s

    Chat Online
  • How To Price A Product A Scientific 3-Step Guide (With

     · There are lots of product-pricing strategies out there based on the study of human psychology. Ending your price with a 9 or a 5 for example is called "Charm Pricing." Millions of businesses have used charm pricing to price their products and it s proven to increase sales.. Or there s "The Rule of 100 " a fantastic psychological hack to maximize the perceived magnitude of your

    Chat Online
  • Important Thumb Rules For Estimation In Civil Engineering

     · Thumb Rules has no unit systems We use the thumb rules for almost every calculation like concrete calculation manpower estimation the material requirement for plastering wastage s calculation brickwork calculation etc. For example What is the requirement of bricks for 1 Cubic metre As per the calculation 625 nos. But we Say Approx

    Chat Online
  • Methods of Detailed Construction Estimation Preparation

    The cost of these includes first cost freight insurance and transportation charges. ii) Cost of labour The exact number of labourers required for unit of work and the multiplied by the wages/ day to get of labour for unit item work. iii) Cost of equipment (T P) Some works need special type of equipment

    Chat Online
  • Cost to Install a Foundation2021 Price GuideInch

    Cost to Install a Foundation2021 Price Guide The foundation is the most important part of a construction project as it provides a stable base to build upon. The price to install one varies read below to learn more about the cost.

    Chat Online
  • Average Labour Cost/Price for Brickwork and Foundations

    Lay face brickwork (min. 75 sq. m.). £50 p/sq.m. Rake out for and re-point at ground level. £12 p/sq.m. Rake out for and re-point at first floor level and above. £30 p/sq.m. Cut out existing 100mm thick brickwork for a new door opening fit a lintol. £425. As above but through a 230mm or cavity wall.

    Chat Online
  • How to Estimate the Cost of Interior Building Finishes

     · The labor material and equipment costs for interior finishes are generally calculated as a single unit price. These unit prices have been developed over time. The general rule of thumb for these unit prices is that the material is about half the cost and installation is the other half. The cost

    Chat Online
  • NVQ Plastering Foundation Construction Diploma (QCF

    Requirements. You will be assessed on your English and Maths skills at interview. 3 GCSEs D-G including Maths and English. Good School reports or references showing the ability to work closely with others as part of a group After applying you will have an interview to determine which course is suitable for your needs and abilities.

    Chat Online
  • OPERATING COST MANUAL

     · parking spaces for each unit in proportion to total parking spaces for the project. An example of how to determine whether proration is advisable is presented in . Figure "A" Assume a budget for a 100 unit condominium project consisting of 50 two-bedroom units of 1 000 square feet of floor space each and 50 three-bedroom units with

    Chat Online
  • Certificate III in Solid PlasteringTAFE Queensland

    This unit of competency specifies the outcomes required to use solid plastering tools plant and equipment. It includes the identification selection and safe use of a range of commonly used solid plastering tools plant and equipment and the storage and user maintenance of these.

    Chat Online